

Projects (as Main Contractor)
New Built Works Construction:
Residential Building, No. 4 Kent Road, Kowloon Tong
Residential Building, No. 147 Waterloo Road, Kowloon Tong
Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon
Commercial Building, 40 Kimberley Road, Tsim Sha Tsui
Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon
Sha Tin Fo Tan Data Center Project
Redecoration Work
Kau To Shan and Hong Lok Yuen South Bay, Shouson Hill, Mount Kellett
和明以主承建(jiàn)商(shāng)的(de)身份完(wán)成了:
1.
2.香港觀塘新清水灣道重(zhòng)置香港扶幼會盛德(dé)中心學校建築工程(整單所有(yǒu)項目)
4.沙田火炭(tàn)數據中心(xīn)工程(機電設備連裝修)
6.大(dà)角咀道245-247號住宅(zhái)大樓建築工程(整(zhěng)單所有項目(mù))
7.九(jiǔ)龍塘根德道(dào)4號單幢式住宅(zhái)
9.尖沙咀加連威老道(dào)24A&24B大(dà)廈
10.
11.旺角上海街
12. 屯門環保園廢紙回收廠房及其他相關的(de)發展項目之P1地段
Projects (as Sub Contractor)
Civil Engineering:
Hong Kong's Siu Sai Wan Park Drainage Project,
Government Development Department's Tin Shui Wai Wooden Bridge Project,
Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.
Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.
The renovation project of Sha T
Steel Structure Engineering
Shanghai Lu Pu Bridge Steel Structure Engineering.
Design and manufacture of installation works:
Mobile safety fence in the Wan Chai - Central Phase II reclamation works.
Other projects completed by the Company include:
土片多多麻豆,s8sp加密路线和普通路线麻豆,黑米黑豆黑芝麻豆浆,钱昱慈麻豆程
其他工程
沙田聽濤(tāo)雅苑外(wài)欄&裝飾(shì)工(gōng)程(木器、鐵(tiě)器)